Skip to main content

Construction

Elbros Construction Ltd, together with its sister companies Elbros Concrete Ltd, Elbros Precast Ltd, and Elbros Services Ltd provide services ranging from structural and civil construction to manufacture of precast prestressed elements and batched concrete. We are proud to emphasize that over 60% of our business comes from repeat clients.

02 —

We offer a full range of construction services and products

Services

Construction

We are committed to meeting our customers’ most demanding needs, leveraging our diverse capabilities, extensive expertise, and experience, irrespective of project size or value. Our comprehensive portfolio of services encompasses construction, marine works, landscaping, restoration, excavation, and plant equipment hire. We continuously enhance our in-house resources to tackle new challenges and seize opportunities. By providing a fully integrated service, we ensure the completion of projects according to established requirements and deadlines.

Demolition

Demolition services comprise a professional assessment of the structure to be demolished. It includes assessment of the accessibility, workforce and machinery and equipment required to carry out the job. Demolition work is very sensitive work so it is ascertained that all necessary precautions are taken to isolate the structure form any adjacent properties and to make good any structures to be retained both with respect to structural stability and prevention of water ingress. A safe sequence of works depending on the structure type is determined and carefully executed on site until the structure is completely demolished. Materials from the demolition process are duly separated and transported away from site either to an approved disposal or recycling facility depending on material type. Dust mitigation measures are adopted during both the demolition phase and transportation phase.

Excavation

Elbros is in possession of a variety of extensive excavation equipment ranging from bulldozers, mini to large excavators with various connection and a fleet of tipper trucks. Excavation is carried out to the specifications of the client’s professional consultants while Elbros can provide suggestions based on experience to carry out the excavation work in the most economic and efficient way both financially and timewise. Excavation is done respecting the specified tolerances while safeguarding the stability of any adjacent properties and/or public spaces. Resulting excavated material is transported away using tipper trucks to approved disposal facilities taking the necessary measures to mitigate any dust as well as cleaning of routes outside of the site.

Precast Concrete Elements

Elbros Precast specializes in designing and manufacturing precast pre-stressed components for the local construction industry, catering to both simple domestic applications and complex multi-storey structures. The precast elements primarily include pre-stressed slab units for composite roofing systems and pre-stressed concrete beams to complement the roofing slabs. This approach allows for quicker project completion, enhancing environmental friendliness and economic efficiency. With a production capacity of 300m2 of pre-stressed slabs daily and 120m length of pre-stressed beams on a 5-day cycle, our precast factory ensures timely and efficient manufacturing. Additionally, Elbros Precast produces hollow concrete blocks, with 4,800 pieces of 230mm thick blocks and 6,000 pieces of 175mm thick blocks every two days. Custom-made products like staircase flights, culverts, kerbs, and tailor-made precast elements are also part of our diverse offerings. ELBROS PRECAST

Concrete Works

Elbros Concrete is dedicated to delivering concrete of the highest quality, adhering to stringent specifications and grades outlined in European Norms. Our commitment extends to creating specialized concrete mixes tailored to meet client-specified project requirements. With ownership of two cutting-edge concrete batching facilities, capable of producing over 120m3 per hour, and a fleet of concrete mixer trucks for on-site delivery, we ensure efficiency in every step of the process. Our in-house laboratory conducts regular tests on raw materials, including aggregates and sands, as well as the design of concrete mixes through trial mixes. Furthermore, we perform tests on finished concrete batches sampled directly from project sites, maintaining a comprehensive quality control system. ELBROS CONCRETE

Marine Works

Elbros has experience in new construction, repair and reinstatement of marine structures such as jetties and quay walls. Professional divers that have experience in construction are engaged to assist in the underwater works. Precast elements such as caissons and concrete blocks that would form part of the marine structure can be manufactured to the required material and geometrical specifications. Land machinery and a workforce team are installed on site to coordinate with the underwater works team. All necessary precautions such as the installation of silt curtains are taken to limit as much as possible any possible pollution of the site surroundings both on land and at sea.

Projects.

04 - Our Landmark Projects

Our Projects

Some of The Landmarks We’ve Built.

The Site is on the historic Cambridge Battery. The works consisted of the demolition of the Holiday Inn Hotel, the excavation of the site and the construction of five underground levels of parking including plant rooms, reservoirs and pools and the construction of overlying 350 apartments over 20 floors.
Very few could have carried out a project of such scale in the timeline that it was done. We are happy with the timeframe and happy with the quality. Whilst there were even load bearing masonry works as part of the construction, the workmanship quality at the time was good.
During the course of the project no ready-mix concrete trucks entered the site without the concrete not being sampled and tested. Elbros never had any issues with this procedure. Both inhouse testing from Elbros and testing by independent laboratories was carried out.

MR GEORGE MUSCATGroup Chairman, GAP Holdings Ltd.

When it comes to the workforce and the site management, one could not ask for a better-quality team for this particular project. The quality of work was generally very good particularly when it comes to concrete works.
The workforce is also of high standards and capable of achieving good quality work. Elbros and its workforce also give importance to and respect Healthy & Safety requirements on site.

MR SYLVAN LIAOperations manager, Malta Properties

During these works there was full cooperation from both the workers, and the management team engaged by Elbros. Whatever site works were required, being during the day and night time (the project dictated that part of the works are carried out at night time), was accommodated. The preparation of the sub-structure in the basement levels were carried out smoothly during the night with good coordination with tenants occupying these areas and minimum disturbance.
The structural frame was executed over a short period of time of 10 months, commencing in July 2017 from road level upwards and finishing the last roof works in April 2018.
The testing of concrete was carried out both by Elbros in house laboratory as well as an independent laboratory appointed by us. We do not report any issues with concrete strength. The equipment and the workforce strength provided by Elbros provided was adequate for the work to be carried out.

PERIT GERALD DEBONOGroup Architect, Tumas Group

The performance with regards to both Quality issues and Time Schedule was good.
Whenever there was the need for more materials to be delivered to ensure the smooth execution of the project, Mr. Kevin Ellul, one of the Elbros directors, always ensured that this was delivered promptly.
The communication with Perit David and the site management was adequate and efficient. I cannot identify any areas that would require improvement.

MR SAVIOUR ELLULChairman, Elbros Holdings Ltd

Elbros maintained a well organised site and good logistics throughout the multiple phases of this project, despite the whole site area having to be excavated and built upon. They were flexible, proactive and worked well with the design team to deliver.
The quality of the workmanship was excellent. There was little remedial work considering there were tricky aspects such as the interface with the curved glass cladding, which was not easy to construct in concrete.
Whenever we called Elbros, they were available and responsive to help and provided the required push when needed for the sake of the project.
Overall, my experience with Elbros was excellent on this unique and difficult build.

MS CATHERINE HURLEYFormer Chief Executive Officer, The Quad Central

There has always been a good relationship between GAP and Elbros and the amount of work that is still ongoing between GAP and Elbros is proof of such good relationship. We are happy to work with Elbros. They use good materials such as in the case of concrete and precast elements.
Elbros are very reactive when we have any issues such as in case of delays. We understand eachother.

MR GEORGE MUSCATGroup Chairman, GAP Holdings Ltd.

The work started in late 2017 and from their part finished on time as per schedule.
We have found Elbros Ltd very reliable and cooperative with every exigency of the project, especially since the project involved demolishing works and the erection of new floors whilst the Bay Street Shopping Mall below such floors was still operating,

MR PAUL CAMILLERIDirector, beHotel
05 —

Some of our construction projects

This is why ELBROS is trusted with landmark projects, having the capability and the right attitude to finish challenging ventures on time, with the client’s interest as a priority. Since its establishment in 1989, ELBROS achieved sustainability, durability and enhanced quality of life throughout its activities.

Dragonara Business Centre
Client: Dragonara Business Centre
Construction
Malta National Aquarium
Client: Malta National Aquarium
Construction
Holiday Inn Express
Client: Holiday Inn Express
Construction
Hyatt Regency
Client: Hyatt Regency
Construction
Portomaso Buisness Tower & Office Block
Client: Portomaso Buisness Tower & Office Block
Construction
Spinola Park
Client: Spinola Park
Construction
Baystreet Complex
Client: Baystreet Complex
Construction
The Quad Central, Central Business District
Client: The Quad Central, Central Business District
Construction
Go Technical Centre
Client: Go Technical Centre
Construction
Pharmadox Healthcare
Client: Pharmadox Healthcare
Construction
Sterling Chemical Malta, Industrial Development
Client: Sterling Chemical Malta, Industrial Development
Construction
Valletta Fast Ferry Terminal
Client: Valletta Fast Ferry Terminal
Construction
Jetty Works & Slipway - Marsascala
Client: Marsascala
Construction
1995
MCP Car Park - Floriana
Client: MCP
Construction
2002
Gasan Showroom - Mriehel
Client: Gasan
Construction
2007
Fort Cambridge
Client: GAP
Construction
2018
Wembley Business Center
Client: Wembley
Construction
1992
Park Towers Mall
Client: Park Towers Mall
Construction
2000
Eden Leisure Complex
Client: Eden Group
Construction
2003
MMA Building Marsa
Client: MMA Building Marsa
Construction
2006
Kirkop Sports Complex
Client: Kirkop
Construction
2011
AM Business Centre
Client: AM Business Centre
Construction
2020
Hotel Valentina
Client: Hotel Valentina
Construction
2015
Medserv
Client: Medserv
Construction
2021
The Ferries Business Centre
Client: The Ferries Business Centre
Construction
2017
GAP Residential Block Luqa
Client: GAP Residential Block Luqa
Construction
2024
Birgu Bridge
Client: Birgu Bridge
Construction
OTHER SERVICES

Our main pillars